Material Change to Hinkley Point C's Development Consent Order

Introduction

Following the approval of Hinkley Point C’s Development Consent Order in 2013 and the start of construction in 2016, refinements to the design of the nuclear power station and associated development have resulted in a number of changes being approved. In the years since the original application, technology has advanced whilst safer, more efficient methods of operating the power station have emerged.

As a result, we are proposing to apply for consent to make a number of more significant, "material” changes.

We are seeking the views of the local community and relevant stakeholders on the proposed changes through this consultation which will run from the 9th January 2024 to the 29th February 2024.

This consultation is the beginning of the process. The application will eventually be decided by the Secretary of State for Energy Security and Net Zero in early 2026.

We look forward to receiving your views which you can submit using the online feedback form below.

The consultation looks at a number of changes to Hinkley Point C’s design. Use the boxes and links below to explore the changes in more detail. Please share your views by using the online form at the bottom of this web page.

Consultation Topics

Removal of Acoustic Fish Deterrent

The removal of the requirement to install an Acoustic Fish Deterrent system associated with Hinkley Point C's cooling water system.

Environment image

Habitat Creation and Enhancement

New plans for large scale habitat creation that will compensate for the risk of any potential impact on protected fish species as a result of the removal of the acoustic fish deterrent system.

Changes to the Interim Spent Fuel Store and Equipment Storage Building

A change from a 'wet' interim spent fuel store to a 'dry' interim spent fuel store and associated increase in the building's size. This change also includes the replacement of the previously proposed access control building with a new equipment storage building.

Additional Sluice Gate Storage

The addition of four new storage racks to house sluice gates and lifting beams in the area close to Hinkley Point C's cooling water forebays'. They are being added as they are currently not part of the final design.

Relocation and Redesign of the Meteorological Mast

The redesign, relocation and lowering of the meteorological mast and removal of supporting meteorological station that is no longer required. The meteorological station would also be replaced by an equipment compound.

Sub-station

Retention of the Hinkley Point Substation

The retention of the existing temporary electrical substation as a permanent feature in order to supply electricity to neighbouring Hinkley Point A and Hinkey Point B power stations.

The location of on-site changes at Hinkley Point C

Image

Consultation Documents

A summary of all elements being consulted upon in this material change application.

View the document

A non-technical summary of the full Preliminary Environmental Information Report.

View Document

This document provides a preliminary assessment of the likely significant effects  arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects  arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects 
arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects 
arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects 
arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects 
arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document provides a preliminary assessment of the likely significant effects 
arising from the proposed changes. It updates the environmental impact assessment 
submitted with the original DCO application. It has been prepared in accordance with the Infrastructure Planning (Environmental Impact Assessment) Regulations 2017 (EIA Regulations). 

View Document

This document considers the impact of the proposed changes on designated sites 
protected by the Conservation of Habitats and Species Regulations 2017 (Habitats 
Regulations).

View Document

Appendices to support the main Shadow HRA Evidence Report

View Document

Appendices to support the main Shadow HRA Evidence Report

View Document

Appendices to support the main Shadow HRA Evidence Report

View Document

This document provides the plans for the proposed development on-site which are 
proposed to be submitted for approval or information with the Material Change  Application.

View Document

This document provides plans and indicative drawings for the proposed development off site which are proposed to be submitted for approval or information with the Material Change Application.

View Document

Supporting Documents

Hinkley Point C Cooling Water Infrastructure Fish Protection Measures: Report To Discharge DCO requirement CW1 (Paragraph 1) and Marine Licence Condition 5.2.31

View the document

Environmental Impact Assessment Scoping Report Appendices

View the document

Environmental Impact Assessment Scoping Report Glossary and Abbreviations

View the document

 

Environmental Impact Assessment Scoping Report

View the document

Scoping opinion provided by the Planning Inspectorate

View the document

Water quality effects of the fish recovery and return system

View the document

Taking part in the consultation

Public consultation events are being held in key local communities on the following dates. Our team will be on hand to explain the proposals and answer any questions.

Thursday 11 January 2024 – Victory Hall, Stogursey (3 - 7pm)

Address: Victory Hall, 32 Tower Hill, Stogursey, TA5 1PL   

Thursday 18 January 2024 – Cannington Court, Cannington (12 - 5pm)

Address: Cannington Court, Church Street, Cannington, TA5 2HA

For your convenience, we request all attendees to use the Rodway Park and Ride facility. A regular bus service will be available throughout the day.

Further details can be found here

Monday 22 January 2024 – Wembdon Village Hall (The Green) (11am - 3pm)

Address: The Green at Wembdon, Homberg Way, Wembdon, Somerset, TA6 7BY

Tuesday 30 January 2024 – Pawlett Village Hall, Pawlett (4 - 8pm)

Address: Pawlett Village Hall, Pawlett, Somerset TA6 4RY

These are drop-in events and visitors are welcome to join at any point throughout the opening times.

Virtual Exhibition

We are committed to ensuring that everyone can access and understand our proposals so, in addition to our exhibitions, we will be running a series of online engagement events (as detailed above) for those that may prefer the flexibility of being able to join the conversation remotely.

Sharing your views

Having considered the information here, you can also leave your feedback by completing the questionnaire below.

The deadline for submitting your comments is 23:59 on 29th February 2024.

You can also submit your feedback via post. Please send your comments on our proposals to the following address:

Freepost SEC Newgate UK Local

HPC Consultation 2024

Contact us

The best way to contact us about Hinkley Point C is by completing our online enquiry form. You can also call us on 0333 009 7070 (24 hour free phone number).

For EDF's 24/7 media enquiry line call 01452 652233.

Stay connected

Follow Hinkley Point C on social media for the latest updates.

Twitter   LinkedIn   YouTube