Download centre
You can find EDF documents and reports here.
For photo downloads and EDF media information, please visit our dedicated media library.
| Name | Category | Date | Size |
|---|---|---|---|
| Construction Workforce Travel Plan Version 5 2022 | Hinkley Point C | 08-01-2024 | 565.17 KB |
| Construction Traffic Management Plan 18 Nov 2019 | Hinkley Point C | 08-01-2024 | 3.66 MB |
| Shadow HRA Evidence Report (pre-application consultation version) | Hinkley Point C | 08-01-2024 | 82.73 MB |
| Hinkley Point C Material Change Application Plans – Off-Site Measures | Hinkley Point C | 08-01-2024 | 38.56 MB |
| Hinkley Point C Material Change Application Plans – On-Site Measures | Hinkley Point C | 08-01-2024 | 7.99 MB |
| Shadow HRA Evidence Report (pre-application consultation version) Appendix 13-3 Figures | Hinkley Point C | 08-01-2024 | 39.15 MB |
| Shadow HRA Evidence Report (pre-application consultation version) Appendix 13-2 TR595 | Hinkley Point C | 08-01-2024 | 1.99 MB |
| Shadow HRA Evidence Report (pre-application consultation version) Appendix 13-1 TR592 | Hinkley Point C | 08-01-2024 | 1.7 MB |
| Preliminary Environmental Information Report (PEIR) Glossary and Abbreviations | Hinkley Point C | 08-01-2024 | 211.23 KB |
| Preliminary Environmental Information Report (PEIR) Appendices | Hinkley Point C | 08-01-2024 | 1.17 MB |
| Preliminary Environmental Information Report (PEIR) Volume 4 - Cumulative and In-Combination Effects | Hinkley Point C | 08-01-2024 | 407.63 KB |
| Preliminary Environmental Information Report (PEIR) Volume 3 - Proposed Changes Off-Site | Hinkley Point C | 08-01-2024 | 8.03 MB |
| TR479 - Particle Tracking Study of Impinged Sprat from the Proposed Hinkley Point C Fish Recovery and Return | Hinkley Point C | 08-01-2024 | 1.13 MB |
| Transport Topic Paper v2 2022 | Hinkley Point C | 08-01-2024 | 3.41 MB |
| Transport Review Group Quarterly Report 2023 Q2 with Appendix | Hinkley Point C | 08-01-2024 | 1.53 MB |
| Transport Assessment 4.19 - Annex 7 | Hinkley Point C | 08-01-2024 | 78.93 MB |
| Traffic Incident Management Plan March 2019 | Hinkley Point C | 08-01-2024 | 6.79 MB |
| TR515 - HPC Water Quality effects of FRR discharges v2 | Hinkley Point C | 08-01-2024 | 1.13 MB |
| Scoping Opinion Proposed Hinkley Point C New Nuclear Power Station Material Change 1 Application | Hinkley Point C | 08-01-2024 | 3.16 MB |
| Hinkley Point C Material Change Application EIA Scoping Report | Hinkley Point C | 08-01-2024 | 1.87 MB |