Download centre
You can find EDF documents and reports here.
For photo downloads and EDF media information, please visit our dedicated media library.
| Name | Category | Date | Size |
|---|---|---|---|
| EPR UK Decommissioning Waste Inventory.pdf | Supporting Documents | 20-06-2023 | 95.83 KB |
| Dry Interim Storage Facility for ILW.pdf | Supporting Documents | 20-06-2023 | 2.64 MB |
| Decontamination.pdf | Supporting Documents | 20-06-2023 | 673.36 KB |
| Decommissioning.pdf | Supporting Documents | 20-06-2023 | 2.4 MB |
| Critique of the NDA RWMD Disposability Assessment.pdf | Supporting Documents | 20-06-2023 | 45.62 KB |
| Comparison with HSE_NII SAPs.pdf | Supporting Documents | 20-06-2023 | 1.94 MB |
| Case for Disposability of Spent Fuel and ILW.pdf | Supporting Documents | 20-06-2023 | 229.77 KB |
| BAT Demonstration.pdf | Supporting Documents | 20-06-2023 | 659.94 KB |
| Chapter 12 - Non-radiological Impact Assessment.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 820.39 KB |
| Chapter 11 - Radiological Impact Assessment.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 840.81 KB |
| Chapter 10 - Site Environmental Characteristics.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 260.46 KB |
| Chapter 8 - Best Available Techniques.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 668.15 KB |
| Chapter 7 - Measures for Monitoring the Discharges.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 383.86 KB |
| Sub-Chapter 6.5 – Interim storage facilities and disposability for UK EPR™.pdf | 20-06-2023 | 289.7 KB | |
| Sub-Chapter 6.4 – Effluent and waste treatment systems design architecture.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 3.39 MB |
| Sub-Chapter 6.3 – Outputs for the operating installation.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 1.61 MB |
| Sub-Chapter 6.1 – Sources of radioactive materials.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 122.95 KB |
| Sub-Chapter 6.0 – Safety Requirements.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 68.27 KB |
| Chapter 5 - Design principles related to decommissioning.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 174.42 KB |
| Chapter 4 - Aspects having a Bearing on the Environment during Construction Phase.pdf | Pre-Construction Environmental Report (PCER) | 20-06-2023 | 489 KB |