Download centre
You can find EDF documents and reports here.
For photo downloads and EDF media information, please visit our dedicated media library.
| Name | Category | Date | Size |
|---|---|---|---|
| Appendix 14C - Analysis of single failure for main steam line break.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 1.67 MB |
| Appendix 14B - 4900 MWe safety analyses used in Chapter 14.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 4.65 MB |
| Appendix 14A - Computer codes used in Chapter 14.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 617.82 KB |
| Sub-Chapter 13.2 - Internal Hazards Protection.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 755.61 KB |
| Sub-Chapter 13.1 - External Hazards Protection.pdf | 20-06-2023 | 863.87 KB | |
| Sub-Chapter 12.5 - Post accident accessibility.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 97.99 KB |
| Sub-Chapter 12.4 - Dose uptake optimisation.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 281.96 KB |
| Sub-Chapter 12.3 - Radiation protection measures.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 591.07 KB |
| Sub-Chapter 12.2 - Definition of radioactive sources in the primary circuit.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 140.97 KB |
| Sub-Chapter 12.1 - Radiation Protection approach.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 88.58 KB |
| Sub-Chapter 12.0 - Radiation Protection Requirements.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 102.78 KB |
| Sub-Chapter 11.5 - Interim storage facilities and disposability for UK EPR.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 285.14 KB |
| Sub-Chapter 11.4 - Effluent and waste treatment systems design architecture.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 3.36 MB |
| Sub-Chapter 11.3 - Outputs for the operating installation.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 2.7 MB |
| Sub-Chapter 11.2 - Details of the Effluent Management Process.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 378.09 KB |
| Sub-Chapter 11.1 - Sources of radioactive materials.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 162.86 KB |
| Sub-Chapter 11.0 - Safety Requirements.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 67.39 KB |
| Sub-Chapter 10.6 - Main Feedwater System.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 203.39 KB |
| Sub-Chapter 10.5 - Integrity of the main steam lines inside and outside the containment.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 129.26 KB |
| Sub-Chapter 10.4 - Other Features of Steam and Power Conversion Systems.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 388.93 KB |