Gas Credit L&G TSG: Step 7 – Check status then start physical install
There are a few indicators you need to see before you can finish the physical install and finish the job:
- Press 'Check Status' until you see the ‘1.1.1’ service request in the status box on the Toughpad and then you can start the physical meter exchange.
- Once you have finished the physical install, press ‘Check Status’ until you have seen the ‘8.7.2 (Join Type 2 Devices)’ service request.
- Press B on the gas meter to access the Meter Index Screen.
- Do not continue until you have seen the ‘8.7.2 (Join Type 2 Devices)’ service request.
You CANNOT proceed with physical gas meter install if you see:
- 8.1.1 – Commission Device Sync Clock - In Progress / Success


If you see a failure message, abort Gas Meter and contact back office commissioning team to commission PPMID.
You CAN proceed with physical gas meter install if you see:
- Data Model Update – In Progress / Success
- 1.1.1 – Update Primary Tariff – In Progress / Success
- 6.15.1 – Update Security Credentials (KRP)
- 8.7.2 – Join Type 2 Devices

If you see a failure message, leave SMETS2 Electricity meter installed, complete the Gas meter job and do not leave PPMID.
If you see one of the below service requests, press button B on the Gas meter to bring up the meter index in order to purge.
- 1.6 – Update Payment Mode
- 4.1.1 – Read Instantaneous Import Registers
- 4.1.2 – Read Instantaneous Import TOU Matrices

If you see a failure message, leave SMETS2 Gas meter installed, complete Gas job and proceed to PPMID.
One final check:
For Smart to Smart Exchange jobs only, proceed to step 8.
Otherwise you can skip this step.