Download centre
You can find EDF documents and reports here.
For photo downloads and EDF media information, please visit our dedicated media library.
| Name | Category | Date | Size |
|---|---|---|---|
| Sub-Chapter 11.2 - Details of the Effluent Management Process.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 378.09 KB |
| Sub-Chapter 11.1 - Sources of radioactive materials.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 162.86 KB |
| Sub-Chapter 11.0 - Safety Requirements.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 67.39 KB |
| Sub-Chapter 10.6 - Main Feedwater System.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 203.39 KB |
| Sub-Chapter 10.5 - Integrity of the main steam lines inside and outside the containment.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 129.26 KB |
| Sub-Chapter 10.4 - Other Features of Steam and Power Conversion Systems.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 388.93 KB |
| Sub-Chapter 10.3 - Main Steam System (safety classified part).pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 756.11 KB |
| Sub-Chapter 10.2 - Turbo-generator Set.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 82.77 KB |
| Sub-Chapter 10.1 - General Description.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 206.84 KB |
| Sub-Chapter 9.5 - Other Supporting Systems.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 976.38 KB |
| Sub-Chapter 9.4 - Heating, Ventilation and Air-Conditioning Systems.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 3.31 MB |
| Sub-Chapter 9.3 - Primary System Auxiliaries.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 1.2 MB |
| Sub-Chapter 9.2 - Water Systems.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 1022.68 KB |
| Sub-Chapter 9.1 - Fuel Handling and Storage.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 2.14 MB |
| Sub-Chapter 8.6 - Prevention and protection against common cause failure.pdf | 20-06-2023 | 199.04 KB | |
| Sub-Chapter 8.5 – Installation.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 72.05 KB |
| Sub-Chapter 8.4 - Specific Design Principles.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 146.95 KB |
| Sub-Chapter 8.3 - Nuclear Island Power Supply.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 606.68 KB |
| Sub-Chapter 8.2 - Power Supply to the Conventional Island and Balance of Plant.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 99.98 KB |
| Sub-Chapter 8.1 - External Power Supply.pdf | Pre-Construction Safety Report (PCSR) | 20-06-2023 | 99.72 KB |