2018.04 April 2018

Pre-stressing gallery (PSG) surrounding the Nuclea...
Pre-stressing gallery (PSG) surrounding the Nuclear Island
Pre-stressing gallery (PSG) surrounding the Nuclea...
Pre-stressing gallery (PSG) surrounding the Nuclear Island
Pre-stressing gallery (PSG) surrounding the Nuclea...
Pre-stressing gallery (PSG) surrounding the Nuclear Island
Technical Galleries
Technical Galleries
Steel-fixers and rebar cages
Steel-fixers and rebar cages
Concrete batching plants
Concrete batching plants
Pier segments for the Sea Wall
Pier segments for the Sea Wall
Bespoke travelling formwork shuttering system used...
Bespoke travelling formwork shuttering system used to cast pier segments
Platform 12 CRF Gallery with Unit 1 Heat Sink
Platform 12 CRF Gallery with Unit 1 Heat Sink
Unit 1 Heat Sink progress
Unit 1 Heat Sink progress
Ground nail installation in the Heat Sink
Ground nail installation in the Heat Sink
Unit 1 Heat Sink
Unit 1 Heat Sink