Search media library

Folders > Hinkley Point C > 3. Archive > 1. Photos by month > 2017.04 - April 2017

2017.04 - April 2017

625 Sizer with Radial Arm Conveyor crushing dug-up...
625 Sizer with Radial Arm Conveyor crushing dug-up rock on site to use as fill materials
Base cone for the ground granulated blast furnace ...
Base cone for the ground granulated blast furnace slag silo being lowered into place
Connecting pipework for the main dewatering system
Connecting pipework for the main dewatering system
Construction of Ground Water Treatment Plant
Construction of Ground Water Treatment Plant
Excavation of the platform for the sea wall
Excavation of the platform for the sea wall
Ground granulated blast furnace slag silo located ...
Ground granulated blast furnace slag silo located next to the Bylor batching plants
Jetty bank seat
Jetty bank seat
Segregated heavy haul construction traffic passing...
Segregated heavy haul construction traffic passing under the temporary east bridge
View from the batching plants
View from the batching plants
View from the foreshore looking towards the jetty ...
View from the foreshore looking towards the jetty works
View from the south of site looking north
View from the south of site looking north
View of temporary jetty construction and WaveWalke...
View of temporary jetty construction and WaveWalker 1