2017.03 - March 2017

March 2017 - First nuclear safety pour
March 2017 - First nuclear safety pour
March 2017 - The jetty bankseat, where the tempora...
March 2017 - The jetty bankseat, where the temporary jetty connects to the shore
March 2017 - Positioning the concrete mix within t...
March 2017 - Positioning the concrete mix within the gallery worksite
March 2017 - During the pour, any residue is brush...
March 2017 - During the pour, any residue is brushed clear of the reinforcement surface
March 2017 - Checking the reinforcement ties befor...
March 2017 - Checking the reinforcement ties before the concrete pour
March 2017 - Brushing to avoid concrete drying on ...
March 2017 - Brushing to avoid concrete drying on the steel rebar
March 2017 - Preparing the base for the erection o...
March 2017 - Preparing the base for the erection of ground granulated blast surface slag silo, adjacent to the batching plants
March 2017 - Jetty piles that will form part of th...
March 2017 - Jetty piles that will form part of the temporary jetty
March 2017 - Jetty consisting of 80 steel tubular ...
March 2017 - Jetty consisting of 80 steel tubular piles